ALLPLAN Energy Efficiency Program for electrical drives for 6 Smurfit Kappa sites (paper & pulp mills)
Objective
Aim of the project was to optimize the energy efficiency of pumps, fans and compressors of 6 different Smurfit Kappa (one site in each of the following countries: Austria, Great Britain, Italy, France, Spain, and Netherlands). Reason therefore was a companywide internal target for energy savings in the area of electric drives.
ALLPLAN Energy Efficiency Program for the Austrian Cement Industry
Objective
The aim of this project was to identify energy saving potential as well as CO2-emissions reduction potential in the Austrian Cement Industry. Therefore Energy Audits were carried out for all 9 Austrian cement plants as well as 3 milling plants. Additional an industry wide potential study for energy saving opportunities was carried...
Research project: PEAP – Demand Response in the Austrian Industrial and Commercial sector
An increasing share of electricity generation from renewable energy sources requires measures to balance fluctuations in electricity production. Demand side measures, especially demand response solutions, can contribute to integration of renewable energy sources and are a substitute for electrical storage capacity. .
more informationTraining Energy Management System
Objective
The aim of the project was to transfer know how concerning Energy Management Systems and energy optimisation to the management of big industrial sites. Therefore two 4-day training seminars were carried out in Kiev and Kazan. The training seminar had about 15-20 participants.
Support for certification according to EEG (energy management system)
Objective
The aim of the project was to support 2 German paper mills (Meldorf & Tornesch) by implementing an Energy Management System. In the course of the project all relevant data for the certification according to EEG had to be collected and prepared. For the certification the following three lists had to be generated:
Emission report verification
Objective
Independent verification of reported CO2 emissions at the industrial sites in Austria
Identification of potential JI projects in Russia
Objective
The aim of the project is to assess the eligibility of potential greenhouse gas emission reduction projects to be implemented under Article 6: Joint Implementation Mechanism of the Kyoto Protocol to the United Nations Framework Convention of Climate Change as well as to estimate the revenues that can be generated by these projects.
Cleaner Production Assessment (Audit) at two Colombian paper and pulp mills
Objective
The objective of the project is to generate energy and resource savings and optimizing recommendations for 2 paper mills in Columbia which can be implemented by the company and to create an Integrated Energy Management system for the mills, which can address the findings of the audit.
ALLPLAN Energy Efficiency Program for the paper mill Drewsen
Objective
An Allplan Energy Efficiency Program (AEEP) was carried out in order to identify weak points in all energy relevant areas like boiler houses, energy distribution and energy consumers. Energy saving projects had to be identified.
ALLPLAN Energy Efficiency Program for the paper mill Zülpich
Objective
An Allplan Energy Efficiency Program (AEEP) was carried out in order to identify weak points in all energy relevant areas like boiler houses, energy distribution and energy consumers. Energy saving projects had to be identified.
Research project: Paper mill steam network optimisation to increase the system efficiency and the electricity output
The aim of the project is to develop options to lower the back pressure in complex steam systems while maintaining full supply of the heat load. In the course of the research project at the three participant paper mills the options to reduce the back pressure of the steam and consequently the potentials to increase the generated electricity of particular plants are analysed.
more informationALLPLAN Energy Efficiency Program for Glatfelter
Objective
An Allplan Energy Efficiency Program (AEEP) is carried out in order to identify weak points in all energy relevant areas like boiler houses, energy distribution and energy consumers. Energy saving projects had to be identified in 2 different sites of the Glatfleter group in great britain.
Consultancy Services in Support of the Armenian Sustainable Energy Financing Facility - ArmSEFF
Objective
The EBRD aimed to engage technical assistance to carry out comprehensive marketing and information campaign, identify and evaluate investment opportunities from a technical perspective and help end-users prepare bankable projects.
Technical Support for Energy in SMEs in the Caribbean
Objective
The tourist industry is an essential employer and economic factor in Jamaica & Bahamas. Regarding energy both countries are strongly dependent on imports from the U.S., but also their economic dependency to U.S. is very high. They only produce 10% of their food demand by themselves.
ALLPLAN Energy Efficiency Program for Mayr Melnhof Europe Board Sites
Objective
The aim of this project was to reduce energy costs and CO2-emissions in the European Mayr-Melnhof cardboard sites to efficiently fulfil the reduction requirements emanating from the EU-emission trading scheme and to build up a Mayr-Melnhof information system for technical, economical and environmental issues.
Independent Energy Consultan (Verification Consultant) for the Moldovan Sustainable Energy Financing Facility-MoSEFF
Objective
Monitoring and verification of successful implementation of the projects
ALLPLAN Energy Efficiency Program for the pulp & paper mill Sturovo
Objective
An Allplan Energy Efficiency Program (AEEP) was carried out in order to identify weak points in all energy relevant areas like boiler houses, energy distribution and energy consumers. Energy saving projects had to be identified.
ALLPLAN Energy Efficiency Program for electrical drives for 5 UPM sites (paper mills)
Objective:
Aim of the project was to optimize the energy efficiency of pumps and fans of 5 different UPM Kymmene sites (4 in Germany and 1 in Austria). Reason therefore was a companywide internal target for energy savings in the area of electric drives.